Consnant Modular UPS Helps Chengdu Longxing Tunnel Project in Central

Modular UPS Helps Chengdu Longxing Tunnel Project in Central

Project Description:

The Lion Rock Area of Jinjiang District in the southeast of Chengdu, the east side of the South Gate of Sichuan Normal University, the west side of the Chenglong Railway Bridge across the Chengkun Railway and the Chengmianle Intercity Railway, and the Longxing Tunnel Project in Central, according to the overall design requirements, Longxing Tunnel It is a two-way four-lane, single-box double-chamber structure with a tunnel structure with an outsourcing width of approximately 19.5m. The planned Zhonghuan Power Tunnel is located on the south side of the Longxing Tunnel and is laid in the east-west direction. The clearance in the tunnel is about 2.2m (width) x 2.1m (height). The Longxing Road power tunnel is planned to be north-south. The clearance in the tunnel is about 2.2m (width) x 2.1m (height). The power tunnel crosses the municipal tunnel at the intersection of K0+215.

 

Project requirements:

The goal of the construction of the computer room project is to prepare for the inconvenience caused by the power-off flashing and power failure. The monitoring of the speed measurement system in the tunnel is configured under the normal operation, with a total load of 46KW and a backup time of 1h.